Read for more information
Sunshine Leisure Centre
Sunshine Outdoor Pool Works:
We are currently conducting leak investigations, with future works planned to either repair/replace the pool liner or fully replace the pool shell. Throughout this time you may see contractors in the area however, we are attempting to limit pool downtime as much as possible.
Treadmill Replacement:
We are excited to announce the replacement and upgrade of all treadmills. This will occur over the next few months.
Steam Room:
Temporary repairs have been completed, and a full refurbishment is planned within the next two months.
Lift:
We wish to acknowledge that the lift at Sunshine Leisure Centre remains out of order. We have done everything possible to source replacement parts for this older lift model. Due to the scarcity of these parts, they will not arrive until late June. We appreciate your patience as we work through this.
Brimbank Aquatic and Wellness Centre
Accessible Hoists in Change rooms:
A contractor was engaged and repaired the charging points. All 3 hoists are fully operational again.
Waterslide
The waterslide will not be operating on the 28 April - 30 April, reopening on the 1 May. The walls in the waterslide area will be tiled during this time.
Pool Deck Showers
Due to damage to the tiles the shower will be unavailable until repairs are completed.